0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1981
Completion: 1983
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge

Location

Location: ,

Technical Information

Dimensions

total length 686.00 m
span lengths 35.00 m - 14 x 44.00 m - 35.00 m
number of spans 16

Materials

deck prestressed concrete

Participants

Design
Construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007044
  • Published on:
    02/12/2002
  • Last updated on:
    02/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine