General Information
Completion: | 1988 |
---|---|
Status: | in use |
Project Type
Structure: |
Through truss bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge Railroad (railway) bridge |
Material: |
Steel bridge |
Structure: |
Continuous truss bridge |
Location
Technical Information
Dimensions
total length | 876.75 m | |
span lengths | 125.0 m - 137.0 m - 175.0 m - 245.0 m - 165.0 m - 22.3 m | |
number of spans | 6 | |
deck | deck depth | max. 37.50 m |
deck width | 23.6 m |
Materials
truss |
steel
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Construction of Truss bridges in Honshu-Shikoku bridge project (The Yoshima bridge). Presented at: IABSE Symposium: Safety and Quality Assurance of Civil Engineering Structures = Sécurité et assurance de la qualité des structures de génie civil = Sicherheit und Qualitätssicherung von Ingenieurbauwerken, Tokio, Japan, 1986. (1986):
- 与島高架橋上部工の施工 (Construction of Yoshima Viaduct - Honshu-Shikoku Bridge Project). In: Concrete Journal (JCI), v. 24, n. 4 ( 1986), pp. 30-39. (1986):
- About this
data sheet - Structure-ID
20001331 - Published on:
18/02/2001 - Last updated on:
05/02/2016