General Information
Other name(s): | Wuhu Third Yangtze River Bridge |
---|---|
Beginning of works: | 28 December 2014 |
Completion: | End of 2019 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system Three-span cable-stayed bridge |
---|---|
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
upper deck: Motorway bridge / freeway bridge lower deck: High-speed rail bridge |
Location
Technical Information
Dimensions
total length | 4 809.9 m | |
main bridge | ||
---|---|---|
main span | 588 m | |
total length | 1 232 m | |
span lengths | 98 m - 238 m - 588 m - 224 m - 84 m | |
number of spans | 5 | |
lower deck | number of tracks | 4 |
pylons | height | 155 m |
number | 2 | |
upper deck | number of lanes | 2 x 4 |
Materials
piers |
reinforced concrete
|
---|---|
truss |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Design of a rail-cum-road asymmetrical low-pylon cable-stayed bridge with a main span of 588m. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 173, n. 3 (September 2020), pp. 1-25. (2020):
- About this
data sheet - Structure-ID
20072515 - Published on:
27/01/2017 - Last updated on:
20/06/2023