General Information
Other name(s): | Yesanhe Bridge |
---|---|
Completion: | 2009 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 200 m | |
height above valley floor or water | 210 m |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20052344 - Published on:
24/01/2010 - Last updated on:
30/01/2020