General Information
Project Type
Structure: |
Truss arch bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Rotation around a vertical axis |
Material: |
Concrete-filled steel tube (CFST) bridge |
Structure: |
Half-through arch bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Guangzhou, Guangdong, China |
---|---|
Crosses: |
|
Coordinates: | 23° 3' 37.03" N 113° 16' 7.31" E |
Technical Information
Dimensions
main span | 360 m | |
length of side spans | 2 x 76 m | |
total length | 1 084 m |
Materials
piers |
reinforced concrete
|
---|---|
main arch |
concrete-filled steel tubes
|
side arches |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- The 360 m CFST arch of the Yajisha bridge. Presented at: ARCH'01. 3ème conférence sur les ponts en arc, pp. 677-682. (2001):
- (2009): China's Major Bridges. Presented at: IABSE Workshop: Recent Major Bridges, Shanghai, China, 11-12 May 2009, pp. 1-24.
- Development of Concrete-Filled Tubular Arch Bridges, China. In: Structural Engineering International, v. 11, n. 4 (November 2001), pp. 265-267. (2001):
- Hybrid arch bridge using both steel and concrete-filled-steel tubes. Presented at: ARCH'01. 3ème conférence sur les ponts en arc, pp. 833-838. (2001):
- New development of Concrete-Filled Tubular Arch Bridges in China. In: Travaux, n. 781 (December 2001), pp. 91-94. (2001):
- About this
data sheet - Structure-ID
20001306 - Published on:
11/02/2001 - Last updated on:
18/05/2023