General Information

Beginning of works: 3 December 1983
Completion: 2 September 1994
Status: in use

Project Type

Location

Location: , ,
,
Impounds:
  • Paraná River
Coordinates: 27° 28' 57.68" S    56° 43' 29.94" W
Show coordinates on a map

Technical Information

Dimensions

height max. 75 m
total length 65 km
capacity for electric power generation 20 000 GWh/a

Chronology

1 February 1926

Argentine-Paraguayan Protocol regarding the use of the Waterfalls at Apipé is signed in Washington (U.S.).

23 January 1958

An agreement is reached between the Argentine and Paraguayan Republics regarding the study of the exploitation of the Paraná River near the islands of Yacyretá and Apipé. The Mixed Argentine-Paraguayan Technical Commission is established.

3 December 1973

Treaty of Yacyretá is signed in Asunción, Paraguay. It is agreed that both counties will jointly construct a work with several purposes: the hydroelectric exploitation of the Paraná River at the island of Yacyretá, the increased navigability of the area, and the regulation of the river's flow, when necessary, to decrease the effects of flooding at times when the river's banks increase to extraordinary levels.
With this goal in mind, they decide to create the same conditions for both parts, a Bi-National Organization named Yacyretá. This organization is assigned the judicial capacity and the technical responsibility of carrying out the studies and projects of the fore-mentioned works. As a single technical-economic unit, it will also direct, execute, and take advantage of the works once they are underway.

26 April 1989

Final and definitive plans for the works are signed in Ituzaingó, Argentina. These works are for the protection of the valleys along the main tributaries feeding the reservoir along the right margin (Paraguay).

2 September 1994

The first turbine is made functional, so beginning the generation of energy.

7 July 1998, 11:05

The twentieth and final turbine of the work is set into motion.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008435
  • Published on:
    01/03/2003
  • Last updated on:
    24/01/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine