0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1970
Completion: 1971
Status: in use

Project Type

Function / usage: Road bridge
Structure: Girder bridge
Construction method: Balanced cantilever method
Material: Prestressed concrete bridge

Location

Location: , ,
Crosses:
  • Wu-Long River

Technical Information

Dimensions

main span 144 m
total length 549 m

Materials

deck prestressed concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20045343
  • Published on:
    08/06/2009
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine