General Information
Completion: | 2004 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Location
Location: |
Yanggu County, Gangwon, South Korea |
---|
Technical Information
Dimensions
total length | 300 m | |
span lengths | 85 m - 130 m - 85 m | |
number of spans | 3 | |
horizontal radius of curvature | 670 m | |
deck | deck width | 12.7 m |
Quantities
prestressing steel | 205 t |
Materials
substructure |
reinforced concrete
|
---|---|
deck |
prestressed concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20010749 - Published on:
28/11/2003 - Last updated on:
05/02/2016