General Information
Completion: | 1981 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Precast segmental construction using launching gantry |
Material: |
Prestressed concrete bridge |
Location
Location: |
Wiscasset, Lincoln County, Maine, USA Edgecomb, Lincoln County, Maine, USA |
---|---|
Crosses: |
|
Carries: |
|
Coordinates: | 44° 0' 2.38" N 69° 39' 25.70" W |
Technical Information
Dimensions
total length | 829 m | |
span lengths | 27.50 m - 21 x 36.85 m - 27.50 m | |
number of spans | 23 | |
deck | deck depth | 2.10 m |
deck width | 13.62 m |
Cost
cost of construction | United States dollar 8 500 000 |
Materials
deck |
precast prestressed concrete
|
---|
Participants
Owner
Client
Technical advisor to the client
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Pont de Wiscasset aux USA. Presented at: Technique française du Béton Précontraint, IXe Congrès de la FIP Stockholm 1982, pp. 71.
- About this
data sheet - Structure-ID
20008876 - Published on:
07/04/2003 - Last updated on:
02/01/2018