General Information
Completion: | 1993 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Construction method: |
Precast segmental construction |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Oahu Island, Honolulu County, Hawaii, USA |
---|---|
Coordinates: | 21° 24' 12.99" N 157° 50' 5.17" W |
Coordinates: | 21° 24' 9.17" N 157° 48' 57.29" W |
Technical Information
Dimensions
length | 2 x 2013 m | |
span lengths | 42.7 - 91.5 m | |
pier height | 3.66 - 48.8 m |
Materials
superstructure |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Alternative design
Construction drawings
Relevant Web Sites
Relevant Publications
- USA. Le pont à voussoirs préfabriqués de l'autoroute H-3. In: Travaux, n. 673 (February 1992), pp. 30-38. (1992):
- About this
data sheet - Structure-ID
20003503 - Published on:
09/06/2002 - Last updated on:
28/12/2019