General Information
Completion: | 1931 |
---|---|
Status: | in use |
Project Type
Structure: |
Tied-arch bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Reinforced concrete bridge |
Location
Location: |
Tillamook, Tillamook County, Oregon, USA |
---|---|
Coordinates: | 45° 28' 41.70" N 123° 50' 40.23" W |
Technical Information
Dimensions
total length | 54.9 m | |
arch span | 36.6 m |
Materials
arch |
reinforced concrete
|
---|
Notes
First reinforced concrete tied (Bowstring) arch bridge built in the USA.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Elegant Arches, Soaring Spans. C.B. McCullough Oregon's Master Bridge Builder. Oregon State University Press, Corvallis (USA), pp. 137. (2001):
- Historic Highway Bridges of Oregon. 2nd edition, Oregon Historical Society, Portland (USA), pp. 107. (1989):
- About this
data sheet - Structure-ID
20006862 - Published on:
14/11/2002 - Last updated on:
05/02/2016