General Information
Other name(s): | Ponte Wilson Pinheiro; Ponte Brasil-Bolívia |
---|---|
Beginning of works: | 2003 |
Completion: | 2004 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with fan system |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Longitudinal launching |
Material: |
Composite bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Brasiléia, Acre, Brazil Cobija, Nicolás Suárez, Pando, Bolivia |
---|---|
Crosses: |
|
Coordinates: | 11° 0' 57.99" S 68° 45' 5.49" W |
Technical Information
Dimensions
span lengths | 77 m - 42 m | |
number of spans | 2 | |
deck | deck width | 8.70 m |
pylon | pylon height | ca. 38 m |
Materials
pylon |
concrete
|
---|---|
deck |
composite
|
Participants
Design
Structural engineering
- Rui Nobhiro Oyamada (structural engineer)
- Iberê Martins da Silva (structural engineer)
- Andrea Akemi Yamasaki (structural engineer)
- Tunehiro Uono (structural engineer)
- Manoel Rodrigues da Rocha Junior (structural engineer)
Consulting engineers
- Hideki Ishitani (consulting engineer)
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Steel - Concrete cable-stayed bridge over Acre river between Brazil and Bolivia. Presented at: Steelbridge 2004, Millau, 23-25 June 2004, pp. 41-42. (2004):
- About this
data sheet - Structure-ID
20015981 - Published on:
06/04/2005 - Last updated on:
05/02/2016