General Information
Project Type
Structure: |
Three-hinged arch bridge |
---|---|
Function / usage: |
Wildlife crossing |
Material: |
Timber bridge |
Location
Location: |
Trebbin, Teltow-Fläming, Brandenburg, Germany |
---|---|
Coordinates: | 52° 9' 16.07" N 13° 14' 24.52" E |
Technical Information
Dimensions
width | min. 39 m | |
arch span | 32.0 m | |
bridge surface | 1 245 m² | |
arches | girder depth | 100 cm |
cover plates | thickness | 15 cm |
Quantities
arches | timber | 517 m³ |
substructure | concrete volume | 1 240 m³ |
reinforcing steel | 82 t |
Design Loads
design code(s) | DIN FB 101 |
Cost
cost of construction | Euro 3 070 000 |
Materials
foundations |
reinforced concrete
|
---|---|
arches |
glued laminated timber (glulam)
|
cover plates |
Cross laminated timber
|
Participants
Owner
Client
Design
Structural engineering
Soil investigation report
Checking engineering
-
Blaß & Eberhart GmbH Ingenieurbüro für Baukonstruktionen
- Hans Joachim Blaß (checking engineer)
Timber construction
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2014. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2014, pp. 61-73.
- About this
data sheet - Structure-ID
20066126 - Published on:
29/04/2014 - Last updated on:
05/02/2016