0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Azov Footbridge
Beginning of works: 2013
Completion: 1 September 2014
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Don River
Coordinates: 47° 6' 57.25" N    39° 25' 44.60" E
Show coordinates on a map

Technical Information

Dimensions

total length 112 m
deck width 2.5 m
number of spans 3
walkway width 2.5 m
abutments number 2
piers number 2
pylons number 2

Materials

piers reinforced concrete
pylons steel
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20063043
  • Published on:
    03/04/2012
  • Last updated on:
    20/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine