0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2017
Completion: 2018
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Scheldt River
Replaces: Wetteren Footbridge (1957)
Coordinates: 51° 0' 32.15" N    3° 53' 5.81" E
Show coordinates on a map

Technical Information

Cost

cost of construction Euro 4 800 000

Materials

pylon steel
deck of main span steel

Participants

Contractor
Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20082648
  • Published on:
    29/03/2022
  • Last updated on:
    31/03/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine