General Information
Completion: | 1888 |
---|---|
Status: | in use |
Project Type
Structure: |
Whipple type truss bridge Through truss bridge |
---|---|
Material: |
Steel bridge |
Function / usage: |
original use: Road bridge current use: Bicycle and pedestrian bridge |
Location
Location: |
Franklin County, Ohio, USA |
---|---|
Coordinates: | 40° 7' 0.73" N 82° 56' 21.20" W |
Technical Information
Dimensions
total length | 52.12 m | |
total length | 4.27 m |
Materials
truss |
steel
|
---|
Participants
Contractor
Reconstruction
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2014): Trail Bridge Renovation for the Next 100 Years. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014.
- About this
data sheet - Structure-ID
20071831 - Published on:
15/10/2016 - Last updated on:
31/10/2016