0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2015
Completion: 2020
Status: under construction

Project Type

Structure: Tunnel
Function / usage: Metro tunnel / subway tunnel
Construction method: Tunnel boring machine (TBM)
Cut-and-cover method

Location

Location: , ,
Part of:
Coordinates: 22° 16' 49.72" N    114° 9' 57.19" E
Show coordinates on a map

Technical Information

Dimensions

length of bored tunnels ca. 900 m

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20070958
  • Published on:
    10/03/2016
  • Last updated on:
    10/03/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine