0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1965
Status: in use

Project Type

Location

Location: , , ,
Impounds:
  • Chattahoochee River
Coordinates: 32° 55' 5.83" N    85° 11' 16.37" W
Show coordinates on a map

Technical Information

There currently is no technical data available.

Case Studies and Applied Products

Lift-off tests at West Point Dam and Robert F. Henry Dam

Lift-off tests at West Point Dam and Robert F. Henry Dam

In the 1960s and 70s, the US Army Corps of Engineers regularly used high-strength, smooth, post-tension steel bar tendons for trunnion girder anchorages in many of the dams constructed in this period. These are the structural elements th ... [more]

Participants

Initial construction
Design
Monitoring
Owner
Engineers of Record
Load testing

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20071592
  • Published on:
    08/09/2016
  • Last updated on:
    10/05/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine