0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1990
Completion: 2001
Status: in use

Project Type

Location

km Name

Technical Information

Dimensions

total length 353 km

Cost

cost of construction South Korean won 4 700 000 000

Chronology

21 December 2001

Inauguration of the last section between Gunsan and Muan, 111km, at a cost of 1.2 trillion won.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    10000453
  • Published on:
    10/01/2004
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine