0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Wertstoffhof plus Langwied

General Information

Beginning of works: March 2013
Completion: August 2014
Status: in use

Project Type

Location

Location: , , ,
Address: Mühlangerstraße 100
Coordinates: 48° 10' 15.15" N    11° 26' 15.76" E
Show coordinates on a map

Technical Information

Dimensions

covered area 7000 m²
arch span 65 m

Cost

cost of construction Euro 9 300 000

Materials

building structure steel

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20066953
  • Published on:
    19/03/2015
  • Last updated on:
    26/04/2015
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine