General Information
Completion: | 22 August 1967 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Hydroelectric dam / plant |
---|
Location
Location: |
Douglas County, Washington, USA |
---|---|
Impounds: |
|
Coordinates: | 47° 56' 49.85" N 119° 51' 51.72" W |
Technical Information
There currently is no technical data available.
Excerpt from Wikipedia
Wells Dam is a hydroelectric dam located on the Columbia River, downstream from the confluence of the Okanogan River, Methow River, and the Columbia River in Washington state. The dam, associated structures, and machinery make up the Wells Hydroelectric Project. It is owned and operated by Douglas County Public Utility District.
It has produced electricity since August 22, 1967. Its operating license from the US Federal Energy Regulatory Commission is next up for renewal in 2052. In addition to the two public utility districts, the project provides electricity to Puget Sound Energy, Portland General Electric, PacifiCorp, Avista Corporation, and the Colville Indian Tribe.
Its reservoir is named Lake Pateros. Just below and adjacent is Carpenter Island boat launch and fish hatchery river access. Lake Pateros is not deep but a high volume of water moves through it. Thus, low-head, high-volume Kaplan turbine runners drive generation.
Text imported from Wikipedia article "Wells Dam" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
- About this
data sheet - Structure-ID
20031733 - Published on:
16/09/2007 - Last updated on:
27/09/2022