General Information
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Dresden, Saxony, Germany Coschütz, Dresden, Saxony, Germany |
---|---|
Carries: |
|
Part of: | |
Connects to: |
Coschütz Tunnel (2004)
Dölzschen Tunnel (2004) |
Coordinates: | 51° 1' 21" N 13° 41' 16" E |
Technical Information
Dimensions
main span | 85.00 m | |
bridge surface | 6 110 m³ | |
height above valley floor or water | 35.00 m | |
deck | deck width | 2 x 14.70 m |
superelevation | 2.5 % | |
eastern branch | span lengths | 58.68 m - 85.04 m - 75.29 m |
number of spans | 3 | |
Eastern bridge | ||
---|---|---|
total length | 219.01 m | |
Western bridge | ||
total length | 217.40 m | |
span lengths | 64.47 m - 84.48 m - 68.49 m | |
number of spans | 3 |
Quantities
deck | structural steel | 2 030 t |
concrete volume | 3 180 m³ | |
prestressing steel | 54 t | |
reinforcing steel | 669 t | |
substructure | concrete volume | 6 250 m³ |
reinforcing steel | 598 t |
Cost
cost of construction | Euro 23 100 000 |
Materials
deck |
steel
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Architectural consulting
Checking engineering
- Jörg Peter (checking engineer)
Contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2005. Deutscher Bundes-Verlag, Berlin (Germany), 2005, pp. 81-96.
- «Talbrücke Weißeritz» in Dresden. In: Stahlbau, v. 70, n. 9 (September 2001), pp. 627.
- About this
data sheet - Structure-ID
20006060 - Published on:
09/10/2002 - Last updated on:
05/02/2016