General Information
Project Type
Construction method: |
Balanced cantilever method |
---|---|
Structure: |
Haunched girder bridge |
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Box girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Gujō, Gifu, Japan |
---|---|
Next to: |
Washimi Bridge (2019)
|
Coordinates: | 35° 57' 36.20" N 136° 53' 34" E |
Technical Information
Dimensions
width | 11.6 m | |
total length | 436 m | |
main spans (2x) | 135 m | |
span lengths | 82.3 m - 2 x 135 m - 82.3 m | |
number of spans | 4 | |
horizontal radius of curvature | 600 m | |
deck | deck depth | 3.50 - 8.00 m |
pier P2 | height | 118 m |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Contractor
Relevant Web Sites
- About this
data sheet - Structure-ID
20052790 - Published on:
08/02/2010 - Last updated on:
26/12/2021