0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Loop Road Bridge
Completion: 2011
Status: in use

Project Type

Location

Location: , , , ,
Address: Loop Road
Coordinates: 51° 32' 14.08" N    0° 0' 35.34" W
Show coordinates on a map

Technical Information

Dimensions

number of spans 2

Materials

piers reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
girders steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Baird, David / Kirk, Martin / Dhanipersad, Steve / Cook, Steve (2011): Bridges, short and long term solutions for the London 2012 Games. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011.
  • About this
    data sheet
  • Structure-ID
    20061954
  • Published on:
    05/10/2011
  • Last updated on:
    14/11/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine