General Information
Other name(s): | Loop Road Bridge |
---|---|
Completion: | 2011 |
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Box girder bridge |
Support conditions: |
for registered users |
Structure: |
Two-span continuous girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Stratford, Newham, London, England, United Kingdom |
---|---|
Address: | Loop Road |
Coordinates: | 51° 32' 14.08" N 0° 0' 35.34" W |
Technical Information
Dimensions
number of spans | 2 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridges, short and long term solutions for the London 2012 Games. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- About this
data sheet - Structure-ID
20061954 - Published on:
05/10/2011 - Last updated on:
14/11/2023