0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: December 1904
Completion: October 1905
Status: destroyed (1945)

Project Type

Structure: Three-hinged arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge
Structure: Deck arch bridge

Location

Location: , ,

Technical Information

Dimensions

rise 5.80 m (13 m)
arch thickness 1.06 - 1.60 m
arch arch span 57 m
arches width 10.10 - 8.80 m
deck deck depth 10 m

Cost

cost of construction Mark 158 700

Materials

deck reinforced concrete
arch tamped concrete
abutments reinforced concrete
piers on arch reinforced concrete

Chronology

December 1904
— October 1905

Construction phase.

Participants

Owner
Architecture
Structural engineering
Construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005649
  • Published on:
    30/09/2002
  • Last updated on:
    02/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine