General Information
Project Type
Structure: |
Three-hinged arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge |
Structure: |
Deck arch bridge |
Location
Location: |
Ulm, Baden-Württemberg, Germany |
---|
Technical Information
Dimensions
rise | 5.80 m (13 m) | |
arch thickness | 1.06 - 1.60 m | |
arch | arch span | 57 m |
arches | width | 10.10 - 8.80 m |
deck | deck depth | 10 m |
Cost
cost of construction | Mark 158 700 |
Materials
deck |
reinforced concrete
|
---|---|
arch |
tamped concrete
|
abutments |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Chronology
December 1904
— October 1905 |
Construction phase. |
---|
Participants
Owner
Architecture
- Paul Bonatz (architect)
Structural engineering
- Heinrich von Neuffer (structural engineer)
Construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Instandsetzungsarbeiten an der Wallstraßenbrücke in Ulm an der Donau. In: Beton und Eisen, v. 30, n. 1 ( 1931), pp. 14-18. (1931):
- Neue Brückenbauten. In: Architektonische Rundschau, n. 6 ( 1907), pp. 47-48. (1907):
- Die Wallstraßenbrücke in Ulm a.D. (I). In: Deutsche Bauzeitung, n. 1 ( 1906), pp. 1-4. (1906):
- Die Wallstraßenbrücke in Ulm a.D. (II). In: Deutsche Bauzeitung, n. 2 ( 1907), pp. 7+. (1907):
- Die Wallstraßenbrücke in Ulm a.D. (III). In: Deutsche Bauzeitung, n. 3 ( 1907), pp. 11+. (1907):
- About this
data sheet - Structure-ID
20005649 - Published on:
30/09/2002 - Last updated on:
02/01/2018