General Information
Completion: | 2009 |
---|---|
Status: | in use |
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Precast segmental construction using launching gantry |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Auckland, New Zealand |
---|---|
Coordinates: | 36° 32' 21.89" S 174° 40' 52.47" E |
Technical Information
Dimensions
main span | 76 m | |
total length | 520 m | |
number of spans | 8 | |
bridge surface | 12 130 m² | |
height above valley floor or water | 30.5 m | |
deck | deck width | 2 x 11.7 m |
girder depth | 2.4 - 4.3 m |
Quantities
number of precast segments | 356 | |
deck | concrete volume | 9 500 m³ |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Going round again. In: Bridge Design & Engineering, v. 16, n. 59 (2nd Quarter 2010), pp. 40-41. (2010):
- About this
data sheet - Structure-ID
20059118 - Published on:
14/11/2010 - Last updated on:
05/02/2016