0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1906
Completion: 1907
Status: in use

Project Type

Structure: Through truss bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: ,
Crosses:
  • Suzhou Creek
Replaces: Waibaidu Bridge (1873)
Coordinates: 31° 14' 43.18" N    121° 29' 8.59" E
Show coordinates on a map

Technical Information

Materials

truss steel

Participants

Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20007627
  • Published on:
    09/01/2003
  • Last updated on:
    26/01/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine