0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2008
Completion: 21 January 2013
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , ,
Address: A89
Part of:
Coordinates: 45° 51' 48.56" N    4° 22' 34.45" E
Coordinates: 45° 51' 34.82" N    4° 19' 35.64" E
Show coordinates on a map

Technical Information

Dimensions

tube 1 length 4 000 m
tube 2 length 3 906 m

Case Studies and Applied Products

Steel Fibre Shotcrete in Tunnelling: State of the Art and Examples

Steel Fibre Shotcrete in Tunnelling: State of the Art and Examples

There are many possibilities and reasons for the application of steel fibre concrete in tunnelling, which account for the manifold number of existing uses. The shotcreting construction method has been state ... [more]

Chronology

22 June 2011

Breakthrough in the northern tube.

12 August 2011

Breakthrough in the southern tube

21 January 2013

Opened to traffic

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20063143
  • Published on:
    12/05/2012
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine