0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Tranchée couverte de Villecresnes
Completion: 1996
Status: in use

Project Type

Function / usage: High-speed rail tunnel
Construction method: Cut-and-cover method
Structure: Tunnel

Location

Location: , , ,
Part of:
Coordinates: 48° 44' 0.60" N    2° 30' 28" E
Coordinates: 48° 43' 33.49" N    2° 32' 35.61" E
Show coordinates on a map

Technical Information

Dimensions

total length 2 500 m

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20012101
  • Published on:
    16/05/2004
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine