0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Ferrovia Vicenza-Treviso
Completion: 1877
Status: in use

Project Type

Function / usage: Railroad (railway) line

Location

km Name
0
Show coordinates on a map

Technical Information

Dimensions

length 60.060 km
track gauge 1 435 mm

Chronology

16 July 1877 Section Treviso-Castelfranco Veneto inaugurated
8 August 1877 Section Castelfranco Veneto-Cittadella inaugurated
12 September 1877 Section Cittadella-Vicenza inaugurated

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20085848
  • Published on:
    11/08/2023
  • Last updated on:
    11/08/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine