General Information
Project Type
| Structure: |
Girder bridge Single T-section girder bridge |
|---|---|
| Function / usage: |
Road bridge |
| Material: |
Prestressed concrete bridge |
| Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
| Location: |
São Paulo, São Paulo, Brazil |
|---|---|
| Address: | Avenida das Nações Unidas / Avenia Presidente Juscelino Kubitschek |
| Coordinates: | 23° 35' 23.11" S 46° 41' 27.73" W |
Technical Information
Dimensions
| total length | 270.30 m | |
| total width | 9.50 m | |
| roadway / carriageway width | 8.20 m | |
| main bridge | ||
|---|---|---|
| span lengths | 28.15 m - 35.00 m - 34.00 m - 32.00 m - 29.15 m | |
| number of spans | 5 | |
Materials
| deck |
prestressed concrete
|
|---|
Participants
Landscape architecture
Structural engineering
Geotechnical engineering
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2014): Brasilien - zwei Brücken für São Paulo. Deutsche Ingenieure in Südamerika. In: Bautechnik, v. 91, n. 6 (June 2014), pp. 398-408.
- About this
data sheet - Structure-ID
20066663 - Published on:
10/12/2014 - Last updated on:
02/01/2018



