General Information
Completion: | 2012 |
---|---|
Status: | in use |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Box girder bridge |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Crevillent, Alicante, Valencia, Spain |
---|---|
Part of: | |
Coordinates: | 38° 13' 38.77" N 0° 47' 23.15" W |
Technical Information
Dimensions
total length | 200.00 m | |
span lengths | 28.00 m - 34.00 m - 42.00 m - 2 x 34.00 m - 28.00 m | |
number of spans | 6 | |
number of tracks | 2 | |
deck | deck width | 14.00 m |
deck slab thickness | min. 0.25 m | |
girder depth | 2.60 m |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
precast prestressed concrete
|
Participants
Relevant Web Sites
Relevant Publications
- Criterios de diseño sísmico en viaductos de alta velocidad en la zona de Levante. In: Hormigón y acero, v. 68, n. 281 (1st Quarter 2017), pp. 69-79. (2017):
- About this
data sheet - Structure-ID
20075011 - Published on:
28/03/2018 - Last updated on:
16/04/2018