General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Castres, Tarn (81), Occitanie, France |
---|---|
Crosses: |
|
Coordinates: | 43° 35' 36" N 2° 13' 17" E |
Technical Information
Dimensions
total length | 202.20 m | |
span lengths | 50 m - 90 m - 59.80 m | |
number of spans | 3 | |
height above valley floor or water | 18 m | |
rip-rap | 4 900 t | |
deck | deck depth | 2.70 - 5.70 m |
deck width | 12.00 m |
Quantities
concrete volume | 4 570 m³ | |
prestressing steel | 99 t | |
reinforcing steel | 531 t | |
dam-fill volume | 45 000 m³ | |
excavated material | 3 900 m³ |
Cost
construction cost (without tax) | French Franc 23 900 000 |
Materials
deck |
prestressed concrete
|
---|
Chronology
20 April 1994 | Beginning of construction. |
---|---|
20 October 1995 | End of construction. |
Participants
Owner
- Ministère de l'Equipement, des Transports, du Logement, du Tourisme et de la Mer
- République Française
Client
Structural engineering
Construction engineers
Main contractor
Foundations
Earthworks
Prestressing (internal)
Prestressing (external)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Un grand ouvrage sur l'Agout. Le viaduc de Castres. In: Travaux, n. 739 (February 1998), pp. 34-39. (1998):
- About this
data sheet - Structure-ID
20007227 - Published on:
12/12/2002 - Last updated on:
31/08/2016