General Information
Official designation: | VIA 1183 |
---|---|
Beginning of works: | December 2012 |
Completion: | June 2014 |
Duration of works: | 20 months |
Status: | completed |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
Twin girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Construction method: |
Longitudinal launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Le Genest-Saint-Isle, Mayenne (53), Pays de la Loire, France Saint-Berthevin, Mayenne (53), Pays de la Loire, France |
---|---|
Part of: | |
Coordinates: | 48° 5' 12.40" N 0° 50' 56.95" W |
Technical Information
Dimensions
width | 12.34 m | |
length | 337 m | |
span lengths | 42 m - 5 x 52 m - 42 m | |
number of spans | 7 | |
girder depth | 3.50 m | |
piers | number | 6 |
Quantities
structural steel | 1 113 t | |
concrete volume | 6 043 m³ | |
reinforcing steel | 918.5 t | |
sheet piling | 514 m² | |
total length of piles | 532 m |
Design Loads
design speed | 350 km/h |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Conceding authority
Concessionaire
Architecture
- Jean-Pierre Duval (architect)
-
Architecture NEEL
- Fabrice Néel (architect)
Contractor
Civil works
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Les ouvrages d'art de la LGV BPL. In: Travaux, n. 912 (January 2015), pp. 82-88. (2015):
- About this
data sheet - Structure-ID
20070835 - Published on:
04/03/2016 - Last updated on:
04/03/2016