General Information
Name in local language: | Viaduc de Taulhac |
---|---|
Beginning of works: | 2010 |
Completion: | 8 February 2013 |
Duration of works: | 24 months |
Status: | in use |
Project Type
Structure: |
Twin girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Le Puy-en-Velay, Haute-Loire (43), Auvergne-Rhône-Alpes, France |
---|---|
Part of: | |
Coordinates: | 45° 1' 3.76" N 3° 53' 48.47" E |
Technical Information
Dimensions
total length | 425 m | |
span lengths | 73 m - 3 x 92 m - 73 m | |
number of spans | 5 | |
deck | width | 19.64 m |
piers | height | max. 28.50 m |
Quantities
deck | structural steel | 2 500 t |
concrete volume | 2 400 m³ | |
piles | concrete volume | 1 300 m³ |
substructure | concrete volume | 3 700 m³ |
Cost
cost of construction | Euro 17 000 000 | |
cost of construction per m² | Euro 2 040 |
Materials
deck |
composite
|
---|---|
piles |
reinforced concrete
|
abutment |
reinforced concrete
|
Participants
Owner
Design
Architecture
Checking engineering
Co-contractor
Steel construction
Project controlling