General Information
Completion: | 1998 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Monistrol-d'Allier, Haute-Loire (43), Auvergne-Rhône-Alpes, France |
---|---|
Crosses: |
|
Coordinates: | 44° 58' 2.75" N 3° 38' 48.15" E |
Technical Information
Dimensions
width | 10 m | |
total length | 168 m | |
span lengths | 56 m - 70 m - 42 m | |
number of spans | 3 | |
deck | girder depth | 2.35 m |
deck slab | deck slab thickness | max. 32 cm |
Quantities
abutments | concrete volume | 260 m³ |
deck | structural steel | 510 t |
deck slab | concrete volume | 540 m³ |
reinforcing steel | 138 t | |
piers | concrete volume | 460 m³ |
substructure | concrete volume | 100 m³ |
reinforcing steel | 76 t |
Cost
cost of construction | French Franc 25 000 000 |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
steel
|
Participants
Owner
Client
Checking engineering
Contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le viaduc de Monistrol-d'Allier sur la RD589. In: Travaux, n. 760 (January 2000), pp. 37-41. (2000):
- About this
data sheet - Structure-ID
20006521 - Published on:
05/11/2002 - Last updated on:
05/02/2016