General Information
Project Type
Structure: |
Twin girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Clisson, Loire-Atlantique (44), Pays de la Loire, France |
---|---|
Coordinates: | 47° 5' 53.43" N 1° 17' 23.81" W |
Technical Information
Dimensions
total length | 210 m | |
span lengths | 37.50 m - 2 x 67.50 m - 37.50 m | |
number of spans | 4 | |
deck | width | 13.20 m |
on-center distance between girders | 5.50 m | |
girder depth | 2.25 m | |
number of lanes | 2 | |
roadway / carriageway width | 12 m |
Cost
cost of construction | Euro 5 000 000 |
Materials
deck slab |
precast reinforced concrete
|
---|---|
cross beams |
steel
|
girders |
steel
|
Participants
Owner
Client
Main contractor
Civil works
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le tablier du viaduc de la Sèvre Nantaise à Clisson. In: Travaux, n. 814 (December 2004), pp. 64-70. (2004):
- Viaducs sur la Sèvre et la Moine de la déviation de Clisson. In: Bulletin annuel de l'AFGC, n. 6 ( 2004), pp. 41-44.
- About this
data sheet - Structure-ID
20015088 - Published on:
23/01/2005 - Last updated on:
24/04/2016