General Information
Official designation: | VIA 0769 |
---|---|
Completion: | 2014 |
Status: | completed |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
Twin girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Construction method: |
Longitudinal launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Ballée, Mayenne (53), Pays de la Loire, France |
---|---|
Part of: | |
Coordinates: | 47° 56' 33.65" N 0° 24' 54.43" W |
Technical Information
Dimensions
length | 145.40 m | |
span lengths | 33.00 m - 2 x 39.00 m - 33.00 m | |
deck width | 12.30 m | |
number of spans | 4 | |
girder depth | 2.50 m | |
crossing angle | 100.00 gon |
Design Loads
design speed | 350 km/h |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Conceding authority
Owner
Architecture
- Jean-Pierre Duval (architect)
-
Architecture NEEL
- Fabrice Néel (architect)
Contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Les ouvrages d'art de la LGV BPL. In: Travaux, n. 912 (January 2015), pp. 82-88. (2015):
- About this
data sheet - Structure-ID
20070829 - Published on:
04/03/2016 - Last updated on:
04/03/2016