Official designation: PRA 1058
Beginning of works: 2013
Completion: 2014
Duration of works: 16 months
Status: completed

Project Type

Location

Location: , , ,
Part of:
Crosses: A 81 Motorway (France)
Coordinates: 48° 2' 10.47" N    0° 2' 30.55" E
Show coordinates on a map

Technical Information

Dimensions

width 13.35 m
length 198.22 m
span lengths 29.40 m - 48.76 m - 41.91 m - 29.39 m
number of spans 4
number of tracks 2
piers number 8

Quantities

structural steel 1 760 t
concrete volume 3 850 m³
reinforcing steel 480 t
shotcrete 305 m²

Design Loads

design speed 350 km/h

Materials

piers reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
girders steel

Participants

Conceding authority
Owner
Contractor
Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20070836
  • Published on:
    04/03/2016
  • Last updated on:
    04/03/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine