0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 25 June 1970
Completion: 23 November 1973
Status: in use

Project Type

Function / usage: High-speed rail bridge
Support conditions:
Structure: main bridge:
Deck arch bridge
Material: Structurae Plus/Pro - Subscribe Now!
Structure: viaduct:
Girder bridge
Material: viaduct:
Prestressed concrete bridge

Location

Location: , , ,
, , ,
, , ,
Part of:
Coordinates: 42° 47' 53.71" N    12° 1' 16.87" E
Coordinates: 42° 45' 33.09" N    12° 3' 29.34" E
Show coordinates on a map

Technical Information

Dimensions

width 11 m
length 5 375 m
number of spans 205
arch span 50 m
number of tracks 2
number of arches 5

Materials

superstructure prestressed concrete
piers reinforced concrete
arches reinforced concrete
abutments reinforced concrete
piers on arch reinforced concrete

Chronology

2 October 1975 First train transit on the viaduct

Notes

Longest european railways viaduct at opening date

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20083155
  • Published on:
    22/06/2022
  • Last updated on:
    22/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine