0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 26 July 2012
Status: in use

Project Type

Function / usage: Road tunnel
Structure: Tunnel

Location

Location: , ,
, ,
, ,
, ,
Coordinates: 46° 1' 41.57" N    8° 56' 0.42" E
Coordinates: 46° 1' 50.42" N    8° 58' 0.62" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 2 630 m

Chronology

26 July 2012

Opened to traffic

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20043820
  • Published on:
    21/02/2009
  • Last updated on:
    13/03/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine