General Information
Completion: | 1988 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
main bridge: Balanced cantilever method |
Location
Location: |
Valley City, Pike County, Illinois, USA |
---|---|
Address: | Interstate I-72 / U.S. Route 36 |
Crosses: |
|
Carries: |
|
Coordinates: | 39° 41' 18.02" N 90° 38' 30.82" W |
Coordinates: | 39° 41' 12.28" N 90° 38' 27.15" W |
Technical Information
Dimensions
width | 2 x 11.89 m | |
height above valley floor or water | 22 m | |
deck | number of lanes | 2 x 2 |
eastbound bridge | ||
---|---|---|
total length | 1 015 m | |
westbound bridge | ||
total length | 976 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Prestressing
Form travelers
Lifting
Relevant Web Sites
- About this
data sheet - Structure-ID
20038720 - Published on:
05/08/2008 - Last updated on:
05/02/2016