General Information
Completion: | 2016 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Structure: |
Bowstring-arch-truss bridge |
Location
Location: |
San Sebastián, Gipuzkoa, Basque Country, Spain |
---|---|
Crosses: |
|
Coordinates: | 43° 18' 43.47" N 1° 57' 51.47" W |
Technical Information
Dimensions
span | 61.20 m | |
arch | rise | 10.20 m |
rise:span | 6.0 |
Materials
arches |
steel
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
diagonals (truss) |
steel
|
main girders |
steel
|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Celosías de tablero inferior mixto para ferrocarril. Viaducto de los Tramposos en Valladolid y viaducto del Urumea. Presented at: IV Congreso de la Asociación Científico-Tecnica del Hormigón Estructural - Congreso Internacional de Estructuras, Valencia, 24-27.11.2008. (2008):
- About this
data sheet - Structure-ID
20075836 - Published on:
08/09/2018 - Last updated on:
08/09/2018