General Information
Other name(s): | Ursulabergtunnel |
---|---|
Beginning of works: | April 1998 |
Completion: | December 2003 |
Duration of works: | 57 months |
Status: | in use |
Project Type
Function / usage: |
Road tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Pfullingen, Reutlingen (Kreis), Baden-Württemberg, Germany |
---|---|
Address: | B 312 |
Coordinates: | 48° 27' 39.03" N 9° 13' 55.57" E |
Coordinates: | 48° 28' 17.36" N 9° 13' 53.39" E |
Technical Information
Dimensions
total length | 1 180 m | |
vault | thickness | 40 - 60 cm |
Quantities
concrete volume | 25 000 m³ | |
reinforcing steel | 5 300 t | |
volume of extracted material | 250 000 m³ | |
volume of earthworks | 100 000 m³ |
Cost
cost of construction | Euro 27 000 000 |
Participants
Owner
Client
Design
Structural engineering
Checking engineering
- Matthias Gerold (checking engineer)
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2006. Deutscher Bundes-Verlag, Cologne (Germany), 2006, pp. 133-145.
- About this
data sheet - Structure-ID
20025284 - Published on:
17/11/2006 - Last updated on:
28/05/2021