General Information

Other name(s): Ursulabergtunnel
Beginning of works: April 1998
Completion: December 2003
Duration of works: 57 months
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , ,
Address: B 312
Coordinates: 48° 27' 39.03" N    9° 13' 55.57" E
Coordinates: 48° 28' 17.36" N    9° 13' 53.39" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 180 m
vault thickness 40 - 60 cm

Quantities

concrete volume 25 000 m³
reinforcing steel 5 300 t
volume of extracted material 250 000 m³
volume of earthworks 100 000 m³

Cost

cost of construction Euro 27 000 000

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20025284
  • Published on:
    17/11/2006
  • Last updated on:
    28/05/2021