General Information
Name in local language: | Thurbrücke Ulisbach |
---|---|
Beginning of works: | 2018 |
Completion: | 2019 |
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Structure: |
U-shaped girder bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Lateral / transverse launching |
Location
Location: |
Wattwil, Saint Gallen, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 47° 17' 6.11" N 9° 5' 49.28" E |
Technical Information
Dimensions
span | 46.00 m | |
number of tracks | 1 | |
track gauge | 1 435 mm | |
deck | deck width | 8.20 m |
deck slab thickness | 0.55 - 0.65 m | |
girder depth | max. 3.35 m | |
piles | angle of inclination | 10° |
Cost
cost of construction | Swiss Franc 3 500 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
abutments |
reinforced concrete
|
Participants
Owner
Design
Structural engineering
Checking engineering
Contractor
Relevant Web Sites
Relevant Publications
- Ersatzneubau der Thurbrücke Ulisbach. Planung und projektierter Bauablauf. In: Brückenbau, v. 12, n. 1-2 ( 2020), pp. 86-93. (2020):
- About this
data sheet - Structure-ID
20079570 - Published on:
25/06/2020 - Last updated on:
25/06/2020