General Information
Project Type
Function / usage: |
Road tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Zurich, Switzerland |
---|---|
Coordinates: | 47° 20' 40.21" N 8° 27' 39.09" E |
Coordinates: | 47° 20' 39.04" N 8° 30' 54.04" E |
Technical Information
Dimensions
length | 4.4 km | |
western tube | length | 4 460 m |
Chronology
4 May 2009 | Opened to traffic. |
---|
Participants
Structural engineering
Co-contractor
- Alpine Mayreder Bau GmbH
- CSC Impresa Costruzioni SA
- Murer AG
- Prader AG Tunnelbau
- Wayss & Freytag
- Wayss & Freytag Ingenieurbau AG
- Zschokke Locher AG
- Züblin Schlittler Spaltenstein Bau AG
Prestressing
Construction supervision
Relevant Web Sites
Relevant Publications
- Completata la A4 nel Cantone di Zurigo. In: Strade e Autostrade, v. 14, n. 79 (January 2010), pp. 38-41. (2010):
- In esercizio il primo tratto della Tangenziale Ovest di Zurigo. In: Strade e Autostrade, v. 10, n. 59 (September 2006), pp. 39. (2006):
- More than 1,000 t Post-Tensioning Systems installed in the Reppisch Valley Ventilation Center. SpannStahl AG as partner of the JV Spannarbeiten, Uetliberg Tunnel, Zurich West By-pass, Switzerland. In: DSI Info, n. 14 ( 2006- 2007), pp. 46.
- TBE im Uetlibergtunnel angefahren. In: Felsbau, v. 21, n. 3 ( 2003), pp. 57.
- Über 1.000 t Spannsysteme in Lüftungszentrale Reppischtal eingebaut. SpannStahl AG als Partner der ARGE Spannarbeiten, Uetlibergtunnel, Westumfahrung Zürich, Schweiz. In: DSI Info, n. 14 ( 2006- 2007), pp. 46-47.
- About this
data sheet - Structure-ID
20017887 - Published on:
01/10/2005 - Last updated on:
28/05/2021