0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1979
Completion: 2019
Status: under construction

Project Type

Function / usage: Flood-control dam
Structure: Gravity dam
Material: Concrete dam

Location

Location: ,

Technical Information

Dimensions

height 81.7 m
retained water volume 11 500 000 m³
crest length 270 m
dam volume 337 000 m³
water surface area 460 000 m²

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20070295
  • Published on:
    17/01/2016
  • Last updated on:
    17/01/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine