0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1978
Completion: 1986
Status: in use

Project Type

Location

km Name
Show coordinates on a map

Technical Information

Dimensions

Section Herrnhütte-Flughafen
total length 3.3 km
number of stations 2
Section Plärrer-Herrnhütte
total length 5.6 km
number of stations 8
Section Röthenbach-Plärrer
total length 4.2 km
number of stations 6

Cost

Section Herrnhütte-Flughafen
cost of construction German Mark 180 000 000
Section Plärrer-Herrnhütte
cost of construction German Mark 495 000 000
Section Röthenbach-Plärrer
cost of construction German Mark 285 000 000

Chronology

2 October 1978

Beginning of construction.

28 January 1984

Completion to Schweinau Station.

27 September 1986

Completion to Röthenbach Station.

Relevant Web Sites

Relevant Publications

  • Nürnberg/Baureferat, Stadt (1999): U-Bahn Nürnberg 15. Bollmann Druck GmbH, Zirndorf (Germany), pp. 9.
  • About this
    data sheet
  • Structure-ID
    10000058
  • Published on:
    10/10/2001
  • Last updated on:
    14/08/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine