General Information
Other name(s): | Poole Harbour Bridge |
---|---|
Beginning of works: | 2010 |
Completion: | 4 April 2012 |
Duration of works: | 20 months |
Status: | in use |
Project Type
Structure: |
Bascule bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Awards and Distinctions
2013 |
award winner
for registered users |
---|
Location
Location: |
Poole, Dorset, South West England, England, United Kingdom |
---|---|
Coordinates: | 50° 42' 55.47" N 1° 59' 34.70" W |
Technical Information
Dimensions
total length | ca. 120 m | |
length of movable section | 19 m |
Participants
Design
Architecture
Structural design
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Close to the wind. In: Bridge Update, n. 48 (December 2004), pp. 2.
- Poole Harbour Bridge. Innovation in cable stayed bridge design. Presented at: IABSE Symposium: Long-Span and High-Rise Structures, Kobe, Japan, September 1998, pp. 489-494. (1998):
- Poole progress. In: Bridge Design & Engineering, v. 16, n. 59 (2nd Quarter 2010), pp. 14.
- Second Coming. In: Bridge Design & Engineering, v. 9, n. 30 (1st Quarter 2003), pp. 10.
- About this
data sheet - Structure-ID
20007126 - Published on:
07/12/2002 - Last updated on:
05/02/2016