0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Poole Harbour Bridge
Beginning of works: 2010
Completion: 4 April 2012
Duration of works: 20 months
Status: in use

Project Type

Structure: Bascule bridge
Function / usage: Road bridge
Material: Steel bridge

Awards and Distinctions

2013 award winner  

Location

Location: , , , ,
Coordinates: 50° 42' 55.47" N    1° 59' 34.70" W
Show coordinates on a map

Technical Information

Dimensions

total length ca. 120 m
length of movable section 19 m

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007126
  • Published on:
    07/12/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine