General Information
Name in local language: | Metropolitana di Torino |
---|---|
Completion: | 4 February 2006 |
Status: | in use |
Project Type
Function / usage: |
Metro (rapid transit) network |
---|
Location
Technical Information
Dimensions
number of tracks | 2 | |
number of stations | 23 | |
system length | 15.1 km | |
maximum speed | 80 km/h | |
track gauge | 1 620 mm | |
number of lines | 1 |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- Construction of the Turin Metro Line 2 Tunnel. In: Felsbau, v. 22, n. 6 ( 2004), pp. 33. (2004):
- Line 1 of the Metro Turin. In: tunnel, v. 21, n. 8 (December 2002), pp. 14. (2002):
- La Linea 1 della metropolitana di Torino. In: Strade e Autostrade, v. 14, n. 79 (January 2010), pp. 128. (2010):
- Métro automatique de Turin. Un projet réalisé en peu de temps. In: Tunnels et Ouvrages Souterrains, n. 190 (July 2005), pp. 35-41. (2005):
- La metropolitana di Torino. In: Strade e Autostrade, v. 10, n. 60 (November 2006), pp. 102. (2006):
- About this
data sheet - Structure-ID
20090447 - Published on:
06/02/2025 - Last updated on:
06/02/2025